Biocement Cost Reduction Plan
Biomaterials
Toll versus Build
Cost Reduction Plan
Roebling built a techno-economic model and a step-by-step cost reduction plan that showed which process, scale, and commercial changes would bring the product to its target cost.
80+ scenarios
evaluated across CMO and greenfield options, process options, and sensitivity inputs
8 key design decisions
addressed with 1 integrated model
10 steps
in the cost reduction plan, from current cost to target cost
Challenge
The program wanted to build commercial markets for a biocement product, such as soil stabilization, dust control, and concrete repair, so supply would already exist when it is needed for defense use. The team needed clear decision metrics for its scale-up roadmap, including what the product would cost at a contract manufacturer (CMO) and in a dedicated facility, how process choices would change cost, and which changes would reach the target cost.
Solution
Roebling built a techno-economic model for the biocement process and used it to compare CMO and greenfield options, test process options, and build a cost reduction plan. Roebling added model features as new questions came up, so the final model matched how the team plans to use it.
Results
The team used the cost reduction plan to rank which process and commercial changes to pursue first, and the CMO versus build results to plan the path to dedicated capacity. The process option results guide process development, and the model's toggles let the team test new process data as it becomes available.
Deliverables
Process & Engineering
Block Flow Diagram
The full process from fermentation through final product.
Mass & Energy Balance
Material and energy flows for each production case.
Sized Equipment List
Equipment sized for each greenfield scale.
Chemical & Utility Summary
Time-average and peak loads.
Process Option Analyses
Alternative process choices compared at every CMO and greenfield option.
Cost & Economics
Techno-Economic Model
A working model with toggles, a recipe builder, and a glossary so the team can update it.
CapEx Estimate & Breakdown
Capital cost for each greenfield scale.
COGS Breakdown
Direct COGS and total COGS that includes the cost of capital.
Pro Forma Financial Model
Sources and uses for the greenfield cases.
Scenario Analyses & Tornado Diagrams
Stacked upside and downside cases, with 4 tornados for direct and fully loaded COGS.
Scale & Planning
CMO versus Build Analysis
Three CMO sizes and five greenfield scales compared on CapEx, direct COGS, and total COGS.
Facility Organization Chart
Greenfield staffing with a labor FTE breakdown.
Cost Reduction Action Plan
A waterfall from current cost to target cost, with the effect of each change in order.
TEM Summary Report
Findings and recommendations, delivered with two revisions.
The Approach
Turn model results into an ordered list of actions.
CMO production ran at three sizes, from a demonstration-scale CMO to a large commercial CMO, against a U.S. Midwest greenfield facility at five scales.
One model carried every CMO, greenfield, and process option case through to CapEx, direct COGS, and total COGS on the same basis.
New toggles and inputs were added as the team asked new questions during the work.
Stacked upside and downside cases covered both process and financial inputs.
The cost reduction plan steps from the current cost to the target cost and shows the effect of each process, scale, and commercial change in order.