Decycle is developing a cell-free process to make a commodity bulk chemical. Roebling's integrated techno-economic model gave Decycle a clear no-go on its first route early in the build, then carried a second route through a full facility model that now sets its scale-up targets.

Decycle logo
Decycle logo

200+ scenarios

evaluated in the final techno-economic model, with sensitivity analysis on cost of production and CapEx

2 routes

evaluated, with a no-go on the first found early in the model build, before a full study

2x margin

of current products, projected by the final techno-economic model

Challenge

Decycle's process was at an early feasibility stage, with only the core process step defined and the downstream process not defined at all. As a commodity product, it had to be profitable at volumes that fit realistic demand. Decycle needed to know the cost of production at scale and which cost drivers mattered most.

Solution

Early in the build, the model showed the first route would not be economical at scales that fit reasonable contracted volumes, so Roebling stopped work on it and Decycle redirected its effort. For the second route, Roebling defined the downstream purification process and built an integrated facility model linking the mass and energy balance to equipment sizing, CapEx, OpEx, and the financial model.

Results

Decycle avoided investing in engineering a process that could not compete and moved quickly to a second pathway. The team is using the cost driver results to focus R&D and piloting on the downstream process, and the minimum profitable scale and waterfall chart to set KPI and scale targets for each stage of scale-up.

Deliverables

Process & Engineering

Mass & Energy Balance

Built for the second route, with the downstream purification process defined from the unit operations up.

Sized Equipment List

Equipment options compared for each downstream unit operation.

Cost & Economics

Integrated Techno-Economic Model

Gave a no-go on the first route early, then carried the second through a full facility model.

Financial Model

Showed how cost of capital changes IRR at each scale.

Total Installed Cost Estimate

CapEx per annual kg of product, linked directly to equipment sizing.

Scenario Comparison & Sensitivity Analysis

200+ scenarios on cost of production and CapEx.

Tornado Diagrams

The cost drivers now guiding R&D and piloting on the downstream process.

Scale & Project Planning

Cost-of-Production Waterfall Charts

The path from current to target cost of production through scale, process KPIs, design, financing, and recycling.

TEM Summary Reports (One per Process)

One report per route, including the minimum profitable scale and targets for each stage of scale-up.

Christopher Pirie, Co-Founder and CEO of Decycle

"Roebling showed us that our first route would not work at commodity scale, and that saved us from spending on it. The model of our second route now sets the targets we scale against."

Christopher Pirie

Co-Founder & CEO, Decycle

The Approach

An early answer, then a full facility model.

  • The second route used a different core process to make the same product, this time with a byproduct.

  • Roebling selected the downstream unit operations, compared equipment options for each one, and evaluated the trade-offs.

  • Different solvents for solvent extraction and recycling were evaluated, along with different byproduct options and how each one changed the purification steps.

  • With feedstock supplied by a co-located facility, the model identified the smallest facility that would be profitable.

Sensitivity analysis and tornado diagrams covered direct cost of production and CapEx per annual kg of product, and financial sensitivities showed how cost of capital changes IRR at each scale. A cost-of-production waterfall laid out the path from current to target cost of production through larger scale, process KPI targets, engineering design optimization, lower financing cost, and enzyme and cofactor recycling.

What the team says

"The bioconversion steps were well defined, but the downstream process was a blank page, and that's where much of the cost and uncertainty sat. We designed it from the unit operations up, so the model covered the whole facility and showed Decycle where to focus R&D and engineering efforts next."

Team photo of Crystal Bleecher

Crystal Bleecher

SVP, Process Engineering, Roebling

"The bioconversion steps were well defined, but the downstream process was a blank page, and that's where much of the cost and uncertainty sat. We designed it from the unit operations up, so the model covered the whole facility and showed Decycle where to focus R&D and engineering efforts next."

Team photo of Crystal Bleecher

Crystal Bleecher

SVP, Process Engineering, Roebling

Newsletter

Stay up to date

Get the latest Roebling articles, webinar invites, and product updates straight to your inbox.

By subscribing you agree to Roebling’s privacy policy. Unsubscribe anytime.

Copyright © 2026 Roebling. All Rights Reserved.

Newsletter

Stay up to date

Get the latest Roebling articles, webinar invites, and product updates straight to your inbox.

By subscribing you agree to Roebling’s privacy policy. Unsubscribe anytime.

Copyright © 2026 Roebling. All Rights Reserved.

Newsletter

Stay up to date

Get the latest Roebling articles, webinar invites, and product updates straight to your inbox.

By subscribing you agree to Roebling’s privacy policy. Unsubscribe anytime.

Copyright © 2026 Roebling. All Rights Reserved.

We value your privacy

We use cookies to improve site functionality. Some cookies help us understand how visitors use our site.