EVERY
Biomanufacturing
Cost & Sensitivity Analysis
AACE Class 5-4
EVERY makes egg proteins by precision fermentation and already produces at commercial scale. Roebling is building greenfield models of EVERY's current and next-generation processes, so the team can run cost and sensitivity analysis on a greenfield build and on current and potential production sites.
1128+ changes
to model assumptions made by EVERY's own team, without re-engaging outside engineers or consultants
2 processes
of EVERY's process, current and next, each modeled as a greenfield facility on the same basis
1 day
from raising a process correction to seeing it carried through the model
Challenge
EVERY already produces at commercial scale, so its process is proven and its operating standards are strict. To plan its next stage of growth, the team needed to understand what drives the cost of its current and next-generation processes, in a greenfield facility and at the sites where it produces today and may produce in the future. EVERY's engineers would test every assumption against real operations, so the model had to be transparent and defensible.
Solution
Roebling built greenfield models of EVERY's current and next-generation processes directly in EVERY's workspace, with each scenario carried through to capital cost, operating cost, and unit COGS. Site-specific models for EVERY's current and possible future production sites are the next phase, built on the same basis so greenfield and site cases compare directly.
Results
EVERY's engineers run cost and sensitivity analysis directly in the live model. As process data changes, the team updates the inputs and sees the economic impact right away. Engineering and finance work from one basis when comparing process generations and production sites. EVERY's technical team also uses the model to prioritize cost-down work across technical development, raw materials, and other areas, so effort is focused on the biggest cost levers.
Deliverables
Process & Engineering
Greenfield Process Models
Current and next-generation processes modeled from the ground up in EVERY's workspace.
Mass & Energy Balance
Built with EVERY's engineers so it reflects how they actually run.
Sized & Priced Equipment List
Equipment sized and costed for each process generation.
Cost & Economics
AACE Class 5 Estimate
Capital cost for each greenfield case, traceable to its basis.
OpEx Model
Operating cost for each case, updated by EVERY's team as parameters shift.
Unit COGS
Unit cost compared across process generations on one basis.
Analysis & Sites
Sensitivity & Scenario Analysis
Scenario tools in EVERY's workspace for testing the inputs that drive cost.
Site-Specific Models
In progress. Current and possible future production sites, modeled on the same basis as the greenfield cases.
Integrated Financial Model
Each case connected to EVERY's financial planning, so finance and engineering read the same numbers.

"Having our current and next-generation processes modeled on one basis means finance and engineering are working from the same numbers. We can see what drives our cost and test it ourselves."
Evan Geisert
Chief Financial Officer, EVERY
The Approach
Built collaboratively, from the beginning.
EVERY’s engineers went through the model closely. How each stage of the process is represented. Whether it reflects how they actually run, rather than a textbook version of it. Where a value is set and what happens downstream if they change it. Every one of those questions came from people who run this process every day.
That scrutiny is what the engagement is built around:
Every number can be traced back to the basis it came from, so a correction is a conversation about the engineering itself, not about where a figure came from.
Corrections from their team are worked through together and carried into the model, not logged for a future revision.
EVERY’s engineers keep a running list of what they want the model to do, and the two teams work through it together every week. Much of that list has already been built, and it continues to shape what the platform does next.
What the team says