Gas Fermentation FOAK vs. Nth Plant

Alternative Protein

Gas Fermentation

FOAK vs. Nth Plant

Gas fermentation uses bacteria to turn gases into single cell protein for human food. Roebling was hired to study two routes, one fed by methane and one by CO2 and hydrogen. In seven weeks, Roebling modeled both on one design basis, resulting in an independent view of what a first-of-a-kind plant and an nth plant would cost to build and run, and how long each would take to bring online.

Fine gas bubbles rising through a fermentation broth
Fine gas bubbles rising through a fermentation broth

50% faster

delivering two models, two project schedules, and a memo report

2 routes

methane-fed and CO2-fed, modeled on the same design basis

100+ scenarios

evaluated across both models, including FOAK and nth plant cases

Challenge

The purpose of the study was to find out what a commercial-scale facility for each route would cost to build and run, how long it would take to bring online, and what would limit how fast the industry could scale. Public cost data at this scale was thin, and published estimates used different assumptions. The study needed one consistent, independent basis.

Solution

Roebling built two dynamic TEA models from a mass and energy balance and a sized equipment list, covering the full facility, including utilities and on-site gas production. Each route was costed as a first-of-a-kind plant and as an nth plant, with project schedules for both. Roebling also compared stirred tank, air-lift, and U-tube fermentors, and sterile versus non-sterile designs.

Results

On-site gas production was a major share of CapEx, especially for the CO2 route. Fermentation cooling and oxygen supply were the largest power users for both routes. Siting near existing industrial gas pipelines could save significant cost and time. The report evaluated which equipment could be fabricated and sourced domestically, and flagged what could not.

Deliverables

Techno-Economic Models

Methane Gas Fermentation TEA

A dynamic model of a greenfield, commercial-scale methane-fed facility.

CO2 Gas Fermentation TEA

The CO2-fed route on the same design basis, with on-site hydrogen and CO2 supply.

Mass & Energy Balance

Continuous fermentation and the full downstream process, through dried and packaged bulk protein.

Sized Equipment List

Equipment for the process, supporting utilities, and on-site gas production.

Cost & Schedule

FOAK vs. Nth Plant Cost

The cost of a first-of-a-kind plant compared with an nth plant built after many others.

Project Schedules

A FOAK plant with on-site gas production and an nth plant supplied by pipeline, from engineering through ramp-up.

CapEx Breakdowns

FEL-1 estimates at +/-30%, including bulk material quantities and building size.

OpEx Breakdowns

Media, utilities, labor, and overhead for each route.

Tornado Diagrams

COGS and CapEx sensitivities for each model.

Design & Reporting

Fermentor Type Comparison

Stirred tank, air-lift, and U-tube fermentors evaluated for gas fermentation.

Sterility Design Option

Sterile versus non-sterile fermentors, with the cost of the choice quantified.

Siting & Sourcing Assessment

The benefit of siting near industrial gas pipelines, and which equipment could be sourced in the U.S.

Report Memo

Results, calculation methods, assumptions, and technical discussion topics.

The Approach

The comparison FOAK companies need to plan funding and timelines.

  • Both routes were modeled on the same design basis, so they compare directly.

  • The models were built bottom up from a mass and energy balance and a sized equipment list, not scaled from published estimates.

  • Roebling’s capital project experience covered the whole facility, including utilities, gas production, and the project schedule.

  • Subject matter experts and industry companies were interviewed to test key assumptions.

  • The models are dynamic, so the client can change inputs and test its own scenarios.

What the team says

"Gas fermentation is still early, so the first plant carries costs the nth plant will not. Modeling both routes, both plant types, and the schedule on one basis showed where that gap comes from and what closes it."

Team photo of Phillip Crawford

Phillip Crawford

Director of Project Engineering, Roebling

"Gas fermentation is still early, so the first plant carries costs the nth plant will not. Modeling both routes, both plant types, and the schedule on one basis showed where that gap comes from and what closes it."

Team photo of Phillip Crawford

Phillip Crawford

Director of Project Engineering, Roebling

Newsletter

Stay up to date

Get the latest Roebling articles, webinar invites, and product updates straight to your inbox.

By subscribing you agree to Roebling’s privacy policy. Unsubscribe anytime.

Copyright © 2026 Roebling. All Rights Reserved.

Newsletter

Stay up to date

Get the latest Roebling articles, webinar invites, and product updates straight to your inbox.

By subscribing you agree to Roebling’s privacy policy. Unsubscribe anytime.

Copyright © 2026 Roebling. All Rights Reserved.

Newsletter

Stay up to date

Get the latest Roebling articles, webinar invites, and product updates straight to your inbox.

By subscribing you agree to Roebling’s privacy policy. Unsubscribe anytime.

Copyright © 2026 Roebling. All Rights Reserved.

We value your privacy

We use cookies to improve site functionality. Some cookies help us understand how visitors use our site.