Zya

Precision Fermentation

Toll versus Build

AACE Class 4

Zya makes enzymes by precision fermentation. Roebling built a working techno-economic model that gave Zya a scale-up plan, from tolling at a contract manufacturer to the point where building its own capacity makes sense.

Zya logo
Zya logo

80+ scenarios

evaluated across CMO and build options, facility scales, and sensitivity inputs

Class 4

CapEx estimate (±30%), with a COGS breakdown on both a protein basis and an enzyme activity basis

13 sites

3 CMO sizes, 5 leased building scales, and 5 greenfield scales on the same cost basis

Challenge

Zya needed a scale-up plan. The core questions were at what production volume to move from tolling at a contract manufacturer (CMO) to building its own capacity, and what the minimum viable facility size would be. Zya also had open process questions and needed to know which variables had the largest effect on cost.

Solution

Roebling built a dynamic techno-economic model and compared CMO production, a leased building fit out for bioprocessing, and a greenfield facility at the same production volumes. The team tracked down real CMO capacity and campaign cost assumptions, so tolling and building were compared on real terms.

Results

Zya used the CMO versus build results to plan its manufacturing path as demand grows, and the sensitivity results to focus R&D on the variables with the largest effect on cost. The model and executive summary support fundraising discussions, and the model's toggles let Zya test process options as its data improves.

Deliverables

Process & Engineering

Block Flow Diagram

The full process from fermentation through recovery.

Mass & Energy Balance

Material and energy flows at each scale.

Sized Major Equipment List

Major equipment sized for each build case.

Utility & Chemical Summary

Time-average and peak loads.

Process Option Toggles

Switches that let Zya compare process options inside the model.

Cost & Economics

Techno-Economic Model

A working model Zya can update, with COGS on a protein basis and an enzyme activity basis.

Class 4 CapEx Estimate

Estimated at +/-30% for the leased and greenfield cases.

COGS Breakdown

Direct COGS and total COGS that includes the cost of capital.

Pro Forma Financial Model

Sources and uses for each build case.

Scenario Analyses & Tornado Diagrams

Stacked upside and downside cases, with tornados for fully loaded COGS.

Scale & Planning

CMO versus Build Analysis

Three CMO sizes, a leased building, and a greenfield facility compared on CapEx, direct COGS, and total COGS.

Build Threshold & Minimum Viable Scale

The production volume where building beats tolling, and the smallest facility that makes sense.

TEA Executive Summary Report

Findings and the manufacturing roadmap for Zya's leadership and investors.

Niels Leckie, Co-Founder and CSO of Zya

"We needed to know when building our own capacity would beat tolling. Roebling compared every option on the same basis with real CMO costs, and gave us a model we keep using as our process data improves."

Niels Leckie, PhD

Co-Founder and CSO, Zya

The Approach

Compare tolling and building on real terms.

  • CMO production was evaluated at three different scales, from a demonstration-scale CMO to a large commercial CMO.

  • A leased industrial building and a U.S. Midwest greenfield facility were each evaluated at five scales.

  • One model compared all options on the same cost basis, so Zya did not need separate studies for each.

  • Stacked upside and downside cases identified the key cost drivers to guide process development.

  • Zya received a working model they can update, not only a static report.

What the team says

"A model is only as good as the data that goes into it. It was fun to build a model that compared scales and toll versus build, but tracking down the right assumptions, especially the CMO costs, is what made this analysis valuable."

Team photo of Crystal Bleecher

Crystal Bleecher

SVP, Process Engineering, Roebling

"A model is only as good as the data that goes into it. It was fun to build a model that compared scales and toll versus build, but tracking down the right assumptions, especially the CMO costs, is what made this analysis valuable."

Team photo of Crystal Bleecher

Crystal Bleecher

SVP, Process Engineering, Roebling

Newsletter

Stay up to date

Get the latest Roebling articles, webinar invites, and product updates straight to your inbox.

By subscribing you agree to Roebling’s privacy policy. Unsubscribe anytime.

Copyright © 2026 Roebling. All Rights Reserved.

Newsletter

Stay up to date

Get the latest Roebling articles, webinar invites, and product updates straight to your inbox.

By subscribing you agree to Roebling’s privacy policy. Unsubscribe anytime.

Copyright © 2026 Roebling. All Rights Reserved.

Newsletter

Stay up to date

Get the latest Roebling articles, webinar invites, and product updates straight to your inbox.

By subscribing you agree to Roebling’s privacy policy. Unsubscribe anytime.

Copyright © 2026 Roebling. All Rights Reserved.

We value your privacy

We use cookies to improve site functionality. Some cookies help us understand how visitors use our site.