Power Generation
Bankable feasibility and front-end definition for projects in nuclear, geothermal, waste to energy, and data center power.

Every power project is decided at the front end, by how much of the option space you could afford to price before committing to one configuration.
Roebling prices all of it. Hundreds of configurations across technology, site, cooling, and interconnection, on one basis. Where cost data exists, every figure traces to a source anyone can audit. Where it does not, Roebling builds the unit operation from first principles.
A new basis for power generation front-end design
Uncertainty is quantified for every input and carried through to the levelized cost, so rigor is spent on the drivers that move the number and not the ones that do not.
Hundreds of configurations across design, feedstock, and geography are evaluated before one is carried forward.
Documentation is built for the parties who decide: investors, grant reviewers, offtakers, and independent engineers.
One Partner, from R&D to FID
Typical deliverables
Scoped to the decision at hand. Any of:
Technical definition
Basis of Design
Heat and material balance
PFDs
Equipment list
Utility and interconnection loads
Cooling and heat rejection duty
Custom unit-operation models where no standard library exists
P&IDs and equipment datasheets
Cost and economics
Capital and operating cost estimate classed to the stage of study, with its basis of estimate
Levelized cost of electricity
Capital intensity in $/kW
IRR with sensitivity and uncertainty analysis
Financing and offtake comparison cases
Project schedule